4.
5.
6.
®
EATON Powerware
9125 (9910-P10, P11, P15, P16) UPS Installation Guide for IBM
Carefully position the cabinet upright with the air vents at the top
(see Figure 7).
Continue to the following section, "Installing the UPS," on page 7
to complete the installation.
Air Vents
Figure 7. UPS with Pedestals
Carefully position the cabinets upright with the air vents at the top
(see Figure 8).
Figure 8. Tower UPS with EBMs
INSTALLATION
Air Vents
®
S
Applications
164201633 Rev A
5