Twin-Star 26TF2322 Manuel D'instruction page 4

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4. Locate Hearth/Base (A) and set out fi nished
side up on the fl oor.
5. Insert one Wood Dowel (N) into each of the
pre-drilled holes.
6. Attach the Completed Center Front assembly
from step 3 to the Hearth/Base (A). Make
sure that dowels are seated into the
pre-drilled holes in the Hearth/Base. Using
Bolts (L) and Washers (M) attach panels
through pre-drilled holes in the mounting
blocks.
HAND TIGHTEN ONLY.
7. Locate Left Side Panel (E) and Right Side
Panel (F), insert one Wood Dowel (N) into
each of the pre-drilled holes on the bottom
edge of the panels. Then use Bolts (L) and
Washers (M) through the pre-drilled holes
in the mounting blocks. Attach the Side
Panels to Hearth / Base (A).
HAND TIGHTEN ONLY.
8. Insert wood dowel (N) into the holes in the
Center Left/Right Side Panel (B/C), push
Center Front Bar (S) snug to the Center
Left/Right Side Panel (B/C).
9. Connect the Center Front Bar (S) to the
Left/Right Side Panel (E/F) with Bolts (L)
and Washers (M) through the pre-drilled
holes in the mounting blocks.
HAND TIGHTEN ONLY.
E-3
Right
Side
Panel
F
N
Hearth/Base
N
N
N
L
M
Center Front Bar
Left
Side
Panel
L
M
M
N
N
A
N
N
S
E
L
N

Publicité

Table des Matières
loading

Table des Matières