BREIL YM52 Mode D'emploi page 18

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

(2) To measure the hourly rate of operation
The tachymeter is extremely useful in calculating factory operation efficiency or
machine products amount.
30
20
10
Ex.: 2)
Use the stopwatch to determine how many jobs are accomplished in a specific period
of time.
If 15 jobs are completed in 20 seconds, multiply "180", the figure on the tachymeter
scale indicated by the stopwatch second hand, by 15. Thus, it is estimated that 2,700
jobs will be accomplished in one hour.
T achymeter scale
180
figure at 20 seconds
= 2,700 jobs per hour
14
Ex.: 1)
Use the stopwatch to measure the time required to
complete one job.
If it takes 20 seconds, the stopwatch second hand
indicates "180" on the tachymeter scale. This means that
180 jobs will be accomplished in one hour.
180
= 180 jobs
position
T achymeter scale
figure at 20 seconds
position
x 15 jobs
x 1 job

Publicité

Table des Matières
loading

Table des Matières