Power Supply - S&P TERMOTECH-TS200/03 Manuel D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation and electrical wiring
Before connecting the terminals, make sure that the power supply is switched off.
For wiring the panels in series, use cables of a minimum of 6mm².
TERMOTECH-TS panels have been designed and manufactured to be powered in series, in
predefined groups, as shown in the following table:
Configuration
KIT-TS200/03
Three phase power supply 400V + N + T
KIT-TS200/04
Three phase power supply 400V + N + T
KIT-TS200/06
Three phase power supply 400V + T
KIT-TS200/07
Three phase power supply 400V + T
KIT-TS200/12
Three phase power supply 400V + T
KIT-TS200/14
Three phase power supply 400V + T
Phase 1: remove the screws that fix the
panel cover and take off the panel with
the aid of a screwdriver. Remove the two
hole covers and fit the PG11 glands (not
supplied).
Example of connection of 3 panels in series:
Connect all the panels
to earth (yellow and
green cable) using the
terminals inside and
outside the junction
box.

Power supply

Phase 2: feed the power cable through
the glands and connect it to terminal 1.
Connect the second cable to terminal
2 and take the cables out through the
second gland (this cable is the power
supply for the second panel). Connect
the earth cable.
Description
1 group connection of 3 panels in series.
1 group connection of 4 panels in series.
1 group connection of 6 panels in series.
1 group connection of 7 panels in series.
2 group connection of 6 panels in series.
2 group connection of 7 panels in series.
Phase 3: tighten the glands and refit the
cover.
10

Publicité

Table des Matières
loading

Table des Matières