ORP model in addition
5
ORP PROBE
In compliance with the following layout diagram, the redox probe must be installed after the filter and
before the pH regulation.
1/ Put the saddle horizontally on the pipe. Direct the opening
upward. Mark then drills the pipe.
2/ Install with some Teflon the probe-holder on the saddle.
Remove the plastic protection of the ORP probe and then
take-up on probe-holder and screw (watch whatever it is not
in abutment with the pipe).
3/ Connect the cable of the redox probe (BNC jack) on the base
of the controller box.
Note : the probe must be installed vertically on the saddle. A different
assembly will damage the precision of the probe measure (can make it
non efficiency).
Duo ORP Model in addition :
See Duo model for pH regulation
JUSTDOSING UNO - DUO - REDOX - DUO REDOX - PAPI004051MULTI1 - FR/EN/ES/DE - Rev.05.16
5
2
3
1
3/
2/
1
1/
4
2
3
4
5
N
O
9