•
Alternative deployment as a corrosion monitor without a
connected expansion vessel
For example, instead of a Risycor X on pipe diameters < DN25
Return
Alternative deployment in expansion line
In large installations, a corrosion monitor is recommended in the
expansion line itself.
•
Select a location with enough space all around.
•
Avoid placing the corrosion monitor in extreme sunlight, and align
the corrosion monitor in a position where the connectors will be
32
RETURN
RISYCOR CBU + ZEROFIX
BLIND PLUG
FLOW
RETURN
EXPANSION VESSEL
FILL SET
RISYCOR CBU + ZEROFIX
BLIND PLUG