Installation; Preparation - Resus Risycor NV Manuel

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

■ 6 INSTALLATION
See also the 'Application Guideline' document, where the philosophy
of the use of the Risycor is explained in detail (www.resus.eu).

PREPARATION

Normal use in the return line to the heat generator
The lockshield valve device with corrosion monitor is fitted into
the return line of the heating installation. The direction of flow is
irrelevant. The "third" connection at the bottom of the lockshield
valve device serves to connect the expansion vessel. This vessel
may be screwed in directly or via a length of pipe. In that case, it
is recommended that the top-up line (fill set) should be connected
between the corrosion monitor and the expansion vessel. In this
way, the topping-up water will be filled into the expansion vessel,
without mixing with the system water first.
FLOW
RETURN
EXPANSION VESSEL
FILL SET
RISYCOR CBU + ZEROFIX
EN
31

Publicité

Table des Matières
loading

Table des Matières