Fronius Snapinverter; General; Connect To Fronius Datamanager; Configure Fronius Smart Meter As Primary Meter - Fronius Smart Meter 240V-3 UL Instructions De Service

Masquer les pouces Voir aussi pour Smart Meter 240V-3 UL:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fronius SnapINverter

General

IMPORTANT! Settings in the "Meter" menu item may only be entered by staff trained to
do so!
The service password must be entered for the "Meter" menu item.
Three-phase or one-phase Fronius Smart Meters may be used. In both cases, selection
is made via the "Fronius Smart Meter" item. The Fronius Datamanager automatically
detects the meter type.
One primary meter and several secondary meters can be selected. The primary meter
must be configured before a secondary meter can be chosen.
Connect to
Access Point:
Fronius Dataman-
ager
1
2
3
4
The Fronius Datamanager start page appears.
LAN:
1
2
3
Configure
1
Fronius Smart
Meter as primary
meter
2
3
4
5
6
7
8
9
Select the "Setup" menu on the inverter display and activate the "WLAN Access
Point".
Establish the connection to the inverter in the network settings (the inverter is dis-
played with the name "Fronius_240.XXXXXX").
Enter password: 12345678 and confirm.
In the browser's address bar, enter the IP address
firm.
Connect the Fronius Datamanager and computer with a LAN cable.
Switch the Fronius Datamanager IP switch to position "A".
In the browser's address bar, enter the IP address
Call up the Fronius Datamanager website.
-
Open web browser.
-
In the browser's address bar, enter the IP address (IP address for WLAN:
192.168.250.181, IP address for LAN: 169.254.0.180) or enter and confirm the
host and domain name of the Fronius Datamanager.
-
The Fronius Datamanager website appears.
Click on the "Settings" button.
Log in to the login area with user "Service" and the service password.
Call up the "Meter" menu area.
Select the primary meter from the drop-down list.
Click on the "Settings" button.
Set the meter position of the meter (feed-in point or consumption point) in the pop-up
window. For more information on the position of the Fronius Smart Meter, see
tioning
on page 7.
Set the converter ratio and the network type.
Click the "OK" button when the status OK is displayed. If the timeout status is dis-
played, repeat the operation.
http://192.168.250.181
and con-
http://169.254.0.180
and confirm.
Posi-
25

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Smart meter 480v-3 ulSmart meter 600v-3 ul

Table des Matières