Putting Into Operation - IARP GRAND LUX 150 Instructions D'emploi Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

PUTTING INTO OPERATION

If the cabinet has been sharply tilted while being sited or for mounting of accessories,
it must be left to stand for at least three hours before being started to allow the
lubricating oil to settle in the compressor.
Failure to do so can cause total destruction of the compressor refrigerating system.
Check that the voltage on the identification plate is the same as that of the network.
THE ELECTRICAL SUPPLY LINE TO WHICH THE REFRIGERATOR WILL HAVE
TO BE CONNECTED IS TO BE PROTECTED BY A VERY SENSITIVE DIFFERENTIAL
SWITCH (Rc=16A,Dc=30mA); IT IS ALSO TO BE LINKED TO THE GENERAL
EARTHING PLANT.
Follow the manufacturer's instructions to install the unit, using qualified personnel and complying with
the electrical regulations for the specific country.
Incorrect installation may cause injury and damage; the manufacturer is not liable for this.
The manufacturer disclaims all responsability for any damage to people or things due to incorrect
observance of this rule.
Earthing is necessary and compulsory by law.
Absolutely never use reduction units, patch cords, adapters or multiple socket outlets to connect
the counter. DIRECTLY connect the equipment to the mains.
The cable should be fully extended and located where it is unilikely to be struck, caught or stepped on,
away from water and the other liquids and heat sources and must not be damaged.
In case of breakage of the power cable of the cabinet, it must be replaced by the manufacturer or by
instruction it change of it.
The plug must still be accessible even after installing the unit.
B
A
A
A) Appliance cable
B) Lighting cable
B
A
B
-23-

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Grand lux 200Grand lux

Table des Matières