paramondo LINE Instructions De Montage page 40

Table des Matières

Publicité

40
Anschluss und Inbetriebnahme • Connection and start-up • Connexion et mise en service • Conexión y puesta en servicio • Collegamento e
messa in funzione • Aansluiting en inbedrijfstelling • Podłączenie i uruchomienie • Elektrik bağlantısının yapılması ve işletime alınması
EN
M
Grid
230 V / 50 Hz
Connect the motor according to the connection instructions. To prevent that water penetrates the motor, the connection cable should be
always laid downwards with a loop.
TIP: For the connection of the power grid to the awning motor we advise to use the Hirschmann plug set. You can find it in our shop under
the article number 10050625.
Connection side motor
PE = (green-yellow)
2 = (black/brown)
1 = N (blue)
After the connection the motor vibrates briefly and enters automatically for 10 seconds in learning mode. Since the enclosed radio remote
control is already programmed, it can control the awning immediately. Should this not be the case, you can program the remote control
according to the instructions!
The end points are equally already set to suit the awning. Should you have to modify them, proceed as follows:
1. Setting of the end points in opening direction:
1.1 Open the awning ca. three-quarter and following rotate ca. 20
times the adjusting screw for the correspondent end point in the
minus direction.
1.2 Open the awning slightly further and stop it with your transmitter,
if the motor has not stopped shortly before reaching the end point.
1.3 Should the awning already stop before reaching the desired end
point, press the button for the opening direction and rotate the cor-
respondent adjusting screw slightly further in the plus direction until
the motor has reached the desired end point.
M
L1
N
PE
3
2
1
www.paramondo.de
Connection side grid
2 = L1 (brown)
3
2
1
PE = (green-yellow)
1 = N (blue)
Continuation if the motor has not yet stopped:
1.4 Retract the awning slightly again, so that the awning is opened ca.
three-quarter. Rotate the adjusting screw 20 times more in the minus
direction and check if the motor has stopped shortly before reaching
the desired end point.
1.5 If the end point has not yet been reached, repeat this step until
the motor autonomously stops and go on with the point 1.3.
Attention: the end point in opening direction must be
set so that the arms are still bent and stay under enough
tension.
L1 = Phase (brown)
N = Neutral (blue)
PE = Protective conductor
(green-yellow)

Publicité

Table des Matières
loading

Produits Connexes pour paramondo LINE

Table des Matières