Hydraulic Connection - Hayward element HPE0811D Guide De L'utilisateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
The installation must be carried out by a qualified installer.
Choose an area where the air outlet and sound level will not bother the swimmers.
Choose a place that allows for the clearance required (50cm minimum around the heat pump).
For improved sound insulation, you are advised to install the Element Pump on silent blocks (not supplied)
The floor structure supporting the cabinet should be strong, flat and prepped to drain the condensate water.
for efficiency purposes, void having too great a length of piping between the heat pump and the pool pump room/ housing.
Once all connections have been completed, check for leaks and finally wrap valves and pipes with anti-condensation insulation.
IMPORTANT: Before performing any work on the ELEMENT heat pump, ensure that the the main power switch is turned OFF.
Identify the stickers :
Entrée d'eau = Inlet water
Sortie d'eau = Outlet water
The connection is to be made using a "BY PASS" system» on the filtration circuit, situated between the filter and the water treatment device.
TESTING PRESSURE: 3 bar
SERVICING PRESSURE: 1 bar
Necessary supplies :
3 manually operated by pass (ball) valves
Degreasant
Solvent cement
Connections
Hot water circuit
Cold water circuit
Floor structure should be adequately strong
and fit to drain the condensate water

HYDRAULIC CONNECTION

HPE0811D
HPE1011D
Ø 50 mm
Ø 50 mm
INSTALLATION
0.5 m
19.6 inch
W
a
l
l
HPE1311D
HPE1611D
Ø 50 mm
Ø 50 mm
Filter
Pump
16
Minimum clearance
5 m
16 Ft
Cold Air
HPE1313D
HPE1613D
Ø 50 mm
Ø 50 mm
circuit breaker:
Heat Pump
ELEMENT
HPE2413D
Ø 50 mm

Publicité

Table des Matières
loading

Table des Matières