Fortress Building Products PURE VIEW Instructions D'installation page 7

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Note:
• Post Base Plate holes MUST be positioned a minimum ½"
[12.5mm] from edge of deck board.
• Use only 3/8" [9.5mm] Hex Head Galvanized Bolts. Lag
Screws should NOT be used. Secure each post with four bolts.
Fig. 1
Step 5:
Check Mounted Posts
1. Shim post as needed to ensure post is level.
Fig. 1
UNIVERSAL BRACKET: BRACKET INSTALLATION
Step 1:
Mark Bracket Hole Locations
1. Mark the centerline of each post with a pencil.
2. Take measurements used in Fig. 1 and 2 to mark bottom
and top bracket hole locations onto posts.
Tip:
• Remove all metal shavings from deck, post base
cover, post, and panel before bracket is screwed to
post to prevent rust stains.
Fig. 2
Fig. 2
Wood Block
Joist / Blocking
PURE VIEW: Fe
GLASS BALUSTER INSTALLATION
26
Shim post as needed to
ensure post is level
Deck Board
1/2"
[12.5
]
mm
7

Publicité

Table des Matières
loading

Table des Matières