Fortress Building Products PURE VIEW Instructions D'installation page 13

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step
3: Install Balusters Into Bottom Rail
1. Carefully slip Balusters vertically into each slot of the
bottom rail. Holes in balusters should not be visible after
insertion of baluster into rail. As shown in Fig. 1.
Tip:
• Be sure to wear safety gloves and goggles when handling
Glass.
Fig. 1
*Pure View Standard Grommets come installed in pre-slotted rails.
Step 4:
Install Top Rail
1. Carefully slip Top Rail over the top of the Balusters into the
slots & top Bracket Cups.
2. Pre-drill Bracket Cup holes for screws using a 3/16"
[89.5mm] drill bit.
3. Secure rail to Bracket Cups at this time with provided T-25
Drive Thread-Cutting Screws. Use low speed setting on drill.
Fig. 1
Top Rail
Baluster
Pre-Installed
Grommet*
Pre-slotted
Bottom Rail
PURE VIEW: Fe
GLASS BALUSTER INSTALLATION
26
13

Publicité

Table des Matières
loading

Table des Matières