Fortress Building Products PURE VIEW Instructions D'installation page 18

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

COLLAR BRACKET: BALUSTER INSTALLATION
Step 1:
Install I-Support On Bottom Rail
• Reference I-support installation instructions on page 12.
Step
2: Install Bottom Rail
1. Slide CB-05 Brackets over each end of the bottom rail. Make
sure that all set screw holes face the desired direction.
As shown in Fig. 1.
2. Secure Brackets into pre-drilled Bracket holes on post with
provided T-25 Drive Thread-Cutting Screws.
3. Pre-drill Bracket Set Screw holes on bottom Rail using a
3/16" [89.5mm] drill bit.
4. Secure Bracket to Rail with provided T-25 Drive
Thread-Cutting Screws. Use low speed setting on drill.
As shown in Fig. 2.
Fig. 1
Fig. 2
Set Screw
18
PURE VIEW: Fe
GLASS BALUSTER INSTALLATION
26

Publicité

Table des Matières
loading

Table des Matières