Hitachi CG 22EAS SLP Mode D'emploi page 16

Masquer les pouces Voir aussi pour CG 22EAS SLP:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English
29
Angle transmission (Fig. 36)
Check angle transmission or angle gear for
grease level about every 50 hours of operation by
removing the grease fi ller plug on the side of angle
transmission.
If no grease can be seen on the fl anks of the gears,
fi ll the transmission with quality lithium based
multipurpose grease up to 3/4. Do not completely fi ll
the transmission.
Semi-auto cutting head
Nylon line replacement
(1) Remove the case (31) by fi rmly pushing inward
the locking tabs with your thumbs as shown in
Fig. 37.
(2) After removing the case, take out the reel and
discard the remaining line.
(3) Fold the new nylon line unevenly in half as shown
in picture.
Hook the U-shaped end of the nylon line into the
groove (32) on the center partition of the reel.
16
30
Fig. 35
Fig. 36
31
Fig. 37
Wind both halves of the line on the reel in the
same direction, keeping each half of the line on
its own side of the partition. (Fig. 38)
4˝ (10 cm)
(4) Push each line into the stopper holes (33),
leaving the loose ends approx. 4˝ (10 cm) in
length. (Fig. 39)
(5) Insert both loose ends of the line through the cord
guide (34) when placing the reel in the case. (Fig.
40)
NOTE
When placing a reel in the case, try to line up the
stopper holes (33) with the cord guide (34) for
easier line release later.
32
Fig. 38
33
Fig. 39
33
34
Fig. 40

Publicité

Table des Matières
loading

Table des Matières