Preparation; Installation; Tools And Equipment; Removing The Protective Film - baumarkt TI0190 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation

A certain amount of manual dexterity is required for installation. Observe the

Tools and equipment

previously mentioned sequence of installation steps.
Before beginning, have the following equipment available:
Phillips screwdriver
Drill with bit, suitable for ceiling
Wall plugs and screws
Measuring tape/folding ruler
Spirit level
Pencil
Stable ladder
Air hose for extraction mode, or activated carbon filter for circulating air
mode
Some tasks for the installation will be made much easier if a second
Important!
person is available to assist in passing the tools and to hold the
components.
The painted surfaces of your new extraction hood are covered with film to

Removing the protective film

protect it from scratching during transportation. Only remove the protective film
immediately before final attachment of the extraction hood.
Observe that the appliance can have sharp edges on the inside.
Risk of injury!

Establishing the installation site

Make sure that when drilling the holes no lines are damaged.
Caution!
1. In order to position the appliance exactly above the centre of the cooker, use
a plumb line to mark a point on the ceiling directly above the centre of the
cooker.
2. Position the centre of the base plate over this point in such a way that the
broad side points in the direction from which the extraction hood will later
be controlled and mark the eleven holes (see diagram).
If possible, move the cooker so that there is sufficient space to install
Important!
the extraction hood. Use a stable ladder and get a second person to
assist you.
Please observe your cooker's instruction manual! If a greater
clearance than 65 cm is specified, this must be taken into
consideration.
10

Preparation

Plumb line

Publicité

Table des Matières
loading

Table des Matières