Grohe SENSIA IGS Notice De Montage page 24

Masquer les pouces Voir aussi pour SENSIA IGS:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

MOUNTING INSTRUCTIONS
Mounting
Clarification and preparation
Safety information
Electrical connection must be earthed.
The unit must only be installed in frost-proof areas.
The control electronics are only suitable for use in closed spaces.
If the external connection pipe of the product is damaged,
it must be replaced by an electrician to min imise risks.
The 230 V connection cable must not be taken into the cistern,
and the transformer must not be mounted in the cistern.
Only use original spare parts and accessories. Using other parts
will invalidate the guarantee and the CE mark.
Installation
Ducting is required for the cable. Prepare the wall and tile to the bare-wall protection.
We offer the Rapid SL WC - Element 39112000 with concealed water and power connections
for mounting the GROHE Sensia
IGS shower-toilet.
®
If a toilet from another manufacturer is already fitted, concealed water connection fitting
may be possible. However, the connection dimensions need to be identical. The products
are sometimes fitted with an information sticker with the dimensions on the protective
plate underneath the actuator plate.
Electrical installation
All electrical installation work must be carried out by a qualified electrician ! The guidelines set out in
IEC 60364 - 7 - 701 ( or VDE 0100 Part 701 ) and all national and regional regulations must be complied with !
Only waterproof round cable can be used.
It must be possible to switch the power supply separately.
For flush-mounted cisterns without ducting, the water connection can be taken visibly over the tiles
with copper piping. This means an additional water connection set ( water connection set, short,
item No. 42459000 ) needs to be ordered. Copper pipe and push-fit screw connections need to be
provided on-site.
If the flush-mounted cistern is below the height of 1 metre,
a conventional water connection set needs to be used.
Overview of mounting steps
Mounting involves the following steps :
Cutting flush pipe and discharge pipe to length
Securing the technical unit
Securing the ceramic bowl
Connecting the unit to water, electricity and waste water
Securing the side casings to the technical unit
Commissioning and functional test
Handover to customer
46
1
1
2
1
5
19
4
1
4
6
1
2
1
4 , 5
4 , 5
c m
c m
2
B
5
3
1
A
A
B
C
2
Only cut to length ! Not mounted
before mounting step No. 9.
X
2
2
3
16
Ø
mm
2
X
7
47

Publicité

Table des Matières
loading

Table des Matières