Mechanical Installation; Important Precautions During Installation - HBM C2 Notice De Montage

Masquer les pouces Voir aussi pour C2:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7

Mechanical installation

C2
7.1
Important precautions during
installation
S Handle the transducer with care.
S Comply with the requirements for the force application
parts, as specified in sections 6.3 and 6.4.
S Welding currents must not be allowed to flow over the
transducer. If there is a risk that this might happen,
you must provide a suitable low-ohm connection to
electrically bypass the transducer. HBM offers the
highly flexible EEK ground cable in various lengths for
this purpose, which can be screwed on above and
below the transducer.
S Make sure that the transducer is not overloaded.
WARNING
There is a danger of the transducer breaking if it is over­
loaded. This can cause danger for the operating person­
nel of the system in which the transducer is installed, as
well as for people in the vicinity.
Implement appropriate safeguards to avoid a force over­
shoot (also see Chapter 12 "Specifications", page 29), or
to protect against any dangers that may result.
A0674-5.0 HBM: public
Conditions on site
17

Publicité

Table des Matières
loading

Table des Matières