Gas Connection; Conversion Of Gas Supply - Angelo Po 0N0FAA Manuel D'utilisation

Table des Matières

Publicité

Important
Importante
Those authorised to carry out this operation
must have experience acquired and certifi ed
in the specifi c sector, must make the connec-
tion to the proper standards, and must com-
ply with all the relevant regulations and leg-
islation. Once the connection has been made,
before the appliance is put into operation a
general check must be made to ensure there
are no gas leaks.
To make the connection, connect the mains
line to the appliance's connection pipe, fi tting
a shut-off tap (A), to allow the gas supply to be
cut off when necessary.
Importante
Important
The tap (A), not supplied with the appliance,
must be installed in an easily accessible posi-
tion and its status (on or off ) must be obvious
at a glance.
Cautela - Avvertenza
Caution - Warning
Before doing any work, cut off the mains
electricity supply.
The manufacturer has tested the appliance with
its own mains gas, identifi ed by the sticker ap-
plied to the nameplate.
If the type of gas to be connected is diff erent
from that used for testing, proceed as follows.
Turn off the gas supply tap (A).
1)
Change the top burner nozzles (see page 12).
2)
Change the top burner pilot light nozzles (see
3)
page 13).
Adjust the minimum settings of the gas control
4)
valves of the burners (see page 10).
Remove the sticker from the nameplate and
5)
apply the new one to identify the gas being
used.
Important
Importante
On completion of the operation, make sure
that there are no gas leaks or malfunctions.
3319960_inst_GB_rev.1

GAS CONNECTION

The gas supply pipe must comply with the
national requirements in force and must be
periodically examined and replaced if neces-
sary.

CONVERSION OF GAS SUPPLY

- 9 -
A
Important
Importante
A
GB
ENGLISH

Publicité

Table des Matières

Dépannage

loading

Table des Matières