Flue assembly - Mounting the hood body
• Position the upper chimney section and fix the upper part
to the frame using the 2 screws 12c (2,9 x 6,5) provided.
• Similarly, position the lower chimney section and fix the
lower part to the frame using the 2 screws 12c (2,9 x 6,5)
provided.
Before fixing the hood canopy to the frame:
• Screw the 2 screws 12f half way into the holes provided
in the sides of the bottom of the frame.
• Remove the grease filters from the hood canopy.
• Remove any activated charcoal filters.
• Lift the hood canopy and engage the screws 12f in the
slots (A) as far as they will go.
• Working from below, fix the hood canopy to the frame
(B), using the 4 screws 12q and 4 washers 22 provided,
then tighten all the screws securely.
ELECTRICAL CONNECTION
• Connect the Hood to the Mains Power Supply, inserting a
bipolar switch with a contact aperture of at least 3 mm.
• Remove the Grease filters (see paragraph "Maintenance")
and make sure that the Power cable (A) has been properly
inserted into the Suction fan socket.
• Fasten the connector B to the free socket at the side of the
suction fan
EN
A
B
9 9