Putting Into Operation - Abicor Binzel BRS-LC Mode D'emploi

Masquer les pouces Voir aussi pour BRS-LC:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6 Putting into operation

Maintenance unit
ID 830.0075
Consists of a filter regulator and oiler. The maintenance unit separates solid particles from the
compressed air and adds atomized oil for lubricating the pneumatically driven components.
Injection unit
ID 832.0035
To spray the gas nozzle from the front after cleaning.
Assembly stand
ID 831.0285
Offers a simple and low-cost option of installing the BRS-LC while saving space.
Air-blast and injection
ID 832.0025
unit (24V)
A combination that is used for air-blasting the interior of the gas nozzle and injecting anti-spatter agent
into it through the cable assembly.
Solenoid valve (24V)
ID 832.0005
To air-blast the interior of the gas nozzle through the cable assembly.
Tab. 12
Options
6 Putting into operation
Risk of injury due to unexpected start-up
The following instructions must be adhered to for the entire duration of maintenance, servicing, mounting,
dismounting and repair work:
• Switch off the power source.
• Close off the compressed air supply.
• Disconnect the mains plug.
NOTICE
• Please take note of the following instructions:
• The system may only be installed and put into operation by authorized personnel
6.1 Installation
The BRS-LC can be installed in any position and orientation, with certain reservations. However, a trouble-
free function is only guaranteed if installed as shown in Fig. 3 Torch cleaning station sub-assembly BRS-LC
on page EN-9.
Screw down the BRS-LC on a vibration-free surface or on the optionally available assembly stand by means
of four screws (ø8 mm).
EN - 10
DANGER
 2 Safety on page EN-4
(in Germany see TRBS 1203).
BRS-LC

Publicité

Table des Matières
loading

Table des Matières