Complete Installation; Water System Preparation - Jenn-Air JS42SEDUDW Guide D'installation

Réfrigérateur encastré côte à côte
Masquer les pouces Voir aussi pour JS42SEDUDW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Complete Installation

1. Turn the water supply line valve to the "Open" position.
2. Turn the refrigerator switch to the ON position. See "Power
On/Off Switch" in the Use & Care Guide for instructions. Wait
a few minutes. Check the water line connections for leaks.
3. Remove all boxes, parts packages and packing materials from
the interior of the refrigerator. See the "Cleaning" section in
the Use & Care Guide for instructions. Remove the film and
cardboard from the grille and doors or door frame, depending
on your model.
4. Install the shelves and bins in the refrigerator and freezer
compartments.
5. The controls are preset at the factory to the midpoint setting.
Make sure the compressor is operating properly and that all
the lights are working.
6. Flush the water system before use. See "Water System
Preparation."
To get the most efficient use from your new built-in refrigerator,
read the Use & Care Guide. Keep Installation Instructions and Use
& Care Guide near the built-in refrigerator for easy reference.
16

Water System Preparation

Please read before using the water system.
IMPORTANT: After connecting the refrigerator to a water source
or replacing the water filter, follow the steps below to make sure
that the water system is properly cleaned. This will flush air from
the filter and water dispensing system, and prepare the water filter
for use.
Do not use with water that is microbiologically unsafe or of
unknown quality without adequate disinfection before or
after the system.
NOTE: If your model has a base grille filter system, make sure the
base grille filter is properly installed and the cap is in the horizontal
position.
1. Open the freezer door and turn off the ice maker. The On/Off
switch is located on the top right side of the freezer
compartment. Move the switch to the OFF (right) setting as
shown.
2. Use a sturdy container to depress and hold the water
dispenser lever for 5 seconds, then release it for 5 seconds.
Repeat until water begins to flow. Once water begins to flow,
continue depressing and releasing the dispenser lever
(5 seconds on, 5 seconds off) until a total of 3 gal. (12 L) has
been dispensed. This will flush air from the filter and water
dispensing system, and prepare the water filter for use.
Additional flushing may be required in some households.
NOTE: As air is cleared from the system, water may spurt out
of the dispenser.
3. Open the freezer door and turn on the ice maker. Move the
switch to the ON (left) position.
NOTES:
Allow 24 hours to produce the first batch of ice.
Discard the first three batches of ice produced.
Allow 3 days to completely fill ice container.
Depending on your model, you may want to select the
maximum ice feature to increase the production of ice.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Js48sedudwJs42ppdudbJs48ppdudb

Table des Matières