7.1 Attaching wheel axle and
wheels
● Attach the wheel axle (C) with
wheel locks (E), bolts (F) and hexagon
nuts (G) to the wheel carrier (D) and
fasten with installation tool (T)
(4 - 6 Nm).
● Push wheel (H) onto mounted wheel
axle.
● Push in wheel plug (J) and secure by
driving in roll pin (K).
● Fit wheel cap (I).
● Repeat this procedure on the other
side.
7.2 Installing the chassis and
ejection chute
1 Install the ejection chute
extension
● Place the basic unit (A) onto a block of
wood with a height of approx. 15-
20 cm.
● Engage the hooks (1) of the ejection
chute extension (N) into the
openings (2) on the rear of the basic
unit (A) and turn the extension
downwards so that the front part of the
basic unit is precisely inserted in the
opening of the ejection chute extension.
● Fasten the screws (R) in the lugs of the
hooks (1) (1 - 2 Nm).
2 Attach the chassis
● Push the chassis with both wheel
carriers (3) as far as they will go into the
guides on basic unit (4).
0478 201 9914 B - EN
● Push the bent section of wheel
carrier (5) into the recess on ejection
chute extension (6).
3
● Insert screws (L) through the openings
in wheel carriers (7) and fasten
(3 - 4 Nm).
3 Install strip
The bent section of the wheel
carrier (5) must be precisely
inserted in the recesses on the
ejection chute extension (6).
● Position the strip (O) and fasten
screws (Q) (1 - 2 Nm).
● Lift machine into upright position.
4 Install the discharge flap
● Attach the discharge flap (M) and press
in the pin (P) (use a plastic hammer if
necessary).
4
Ensure that the ribs (8) inside the
discharge flap on the left and right are
all correctly located in the guide groove
of the ejection chute extension (9).
7.3 Opening and closing the
discharge flap
Opening the discharge flap:
● For shredding, fold the discharge
flap (1) upwards and allow the tab (2) to
engage in the ejection chute extension.
Closing the discharge flap:
● For transport or space-saving storage,
lift the tab (2) slightly and fold away the
discharge flap (1) downwards.
7.4 Attaching the upper chute
The chute can only be installed by a
specialist dealer using special
tools. STIHL recommends STIHL
specialist dealers.
● Place upper chute (B) onto lower
chute (1).
● Fold splash guard (2) up as shown and
hold in this position.
● Screw in screws (S).
8. Notes on working with the
machine
8.1 What material can be processed?
Both soft and hard material can be
processed with the garden shredder
GHE 355.
Soft material:
Organic plant trimmings such as fruit and
vegetable waste, flower cuttings, leaves,
etc.
5
Hard material:
Tree and hedge cuttings and thick branch
material with side shoots.
Tree and hedge cuttings should be
processed when fresh, as the
shredding performance is better
with fresh than with dried-out or wet
material.
6
43