S24-188; 128-156A; S30-060; S27-278 - Bradley S19-130 Manuel D'installation

Table des Matières

Publicité

Installation
Assembly of Components and Parts List - S19-130A
3.4
2
Item
Part No.
Qty.
1
S24-189
1
1.1
S24-193
1
1.11
187-053
1
1.12
154-147
1
1.2

S24-188

1
2

128-156A

1
3

S30-060

1
3.1

S27-278

1
Bradley • 215-152 Rev. R; ECN 12-05-016G
1" NPT
Supply Inlet
3.1
3.2
3.3
3.5
3.11
1.12
NOTE: Use
teflon tape
only.
Description
Stainless Steel Showerhead Assy.
Stainless Steel Shroud Kit
Showerhead Shell
Ring
Plastic Showerhead Assembly
Pull Rod - 25½" Long
Stay-Open Ball Valve Assembly
Ball Valve with Jam Nut
3
1.1
1.11
1.2
Items 1.1–1.2 come preassembled as Item 1.
Items 3.1–3.5 come preassembled as Item 3.
Item
Part No.
Qty.
3.11
110-214
1
3.2
140-720
1
3.3
124-048
1
3.4
128-132
1
3.5

142-002DC

1
4
204-421
1
5
114-050
1
11/8/2012
S19-130, S19-130A
5
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-050
1
R
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
4
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
Date
Signed
Date
Signed
Datum
Unterschrift
Date
Signed
Date
Signe
Date
Signed
Description
Jam Nut (only)
Stop Bracket
Washer
Handle
Lockwasher
Emergency Tag
Safety Sign
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

S19-130a

Table des Matières