Husqvarna EPOS Reference station Manuel D'utilisation page 46

Masquer les pouces Voir aussi pour EPOS Reference station:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 51
T20
8.
Connect the low-voltage cable to the reference
station and the power supply. Refer to
where to put the power supply on page 44 .
9.
Attach the low-voltage cable to the post from the
reference station to the power supply with cable
ties.
CAUTION:
cable is not attached tightly with cable
ties it can be damaged in hard wind.
10. Put the power supply at a minimum height of 30
cm / 12 in. from the ground.
11. Connect the power supply cable to a 100-240V
power outlet.
12. Wait until the LED status indicator is solid green.
First the LED status indicator is flashing green for
some minutes. Refer to
reference station on page 48 .
39.4.3 To install the reference station on a
wall
Note:
As wall materials vary, screws for fixing to the
wall are not included.
1.
Hold the arm for the reference station on the wall
where you will attach it. Make 4 marks on the wall
where you will attach 4 screws.
46 - Installation
To examine
If the low-voltage
LED indicator lamp on the
Note:
If the reference station is installed on a
wall the top of the reference station must be above
the wall.
2.
Drill 4 holes in the wall for the 4 screws.
3.
Install the reference station on the wall with 4
screws.
4.
Put the cable of the reference station through the
slot in the arm and install the reference station on
the arm.
1512 - 001 - 11.11.2020

Publicité

Table des Matières
loading

Table des Matières