Baninni BEDTIME Série Mode D'emploi page 15

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2. Attach the handrail joint to the top of the frame stand tubing as illustrated. The spring pin will
click into place once secure. Repeat for the right side of frame. Insert mattress into the crib.
2
CLICK!
1
3. To close the crib side panel; lift up the side of the crib and attach the tubing to the tubing of the
crib body. To access the tubing joint, open the zipper located underneath the front end of top rails
and attach the studs on the tubing to secure. Close the zipper to hide the joint.
3
1
2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bnbt017

Table des Matières