iROB Control
7.3 Graphic display of the process sequence in the special double cycle with double pulse
1
1
Gas preflow
5
2
Soft start
6
3
Start current
7
4
High-current phase
8
Fig. 5
Process sequence
7.4 Welding with manual settings
Fig. 2 Remote control operating panel on page EN-10
To set welding parameters manually, proceed as follows:
1 Press <Softkey 1> (12) in the main window display until
2 <Press key
3 Press <Softkey 1> (12) in the Select characteristic display until
4 Now the wire feeder speed and welding voltage can be set independently of one another in the main
window display.
BAL.0333.0 • 2017-08-31
2
3
4
5
15
14
13
Base-current phase
9
Dynamics
End crater
10 Gas postflow
Wire feeder
11 Wire burn-back
Arc length
12 End crater duration
> (8).
6
7
8
9
12
11
10
13 Double pulse duration
14 High-current phase duration
15 Start current phase duration
(Standard MIG/MAG) appears.
appears.
7 Operation
EN - 13