Enjoy your results
5. START-UP
5.1. Delivery / Unpacking the kiln
The ROHDE Frontloader will usually be delivered on a pallet by a freight-forwarding agent. Immediately after delivery
check the packaging for any visible damage. Should you detect any damage, unpack the pallet together with the
driver and recheck the goods for damage. Enter details of any damage detected on the delivery note and let the
driver countersign your remarks. Keep one copy of the complaint for your files. Inform the freight-forwarding agency
immediately of the damage. Complaints submitted at a later date cannot be taken into consideration.
5.2. Disposal of packing material
Contribute to a clean environment by disposing of wood, cardboard and plastic packaging material at your nearest
waste disposal plant.
For further information concerning the disposal of packaging material please contact your dealer or community
council.
5.3. Installation environment / Location
When selecting a suitable location for your kiln, please note the following guidelines and prepare the kiln environment
accordingly:
• Place the kiln on an even surface.
• The distance to the walls should be at least 25 cm on each side.
• The floor, ceiling insulation, walls, dividing walls, panelling, etc. must be made of flame resistant material.
• Make sure that the kiln environment can be ventilated properly.
• If this is not the case, a ventilation system must be installed. Please consult a qualified technician specialising in this
field.
5.4. Kiln assembly
figure 1
figure 2
22
Page
of 80
Check the enclosed accessories first:
Optional accessory KE-L (100 - 250),
Standard accessory KE-N and KE-S (figure 1):
• 4 cordierite blocks
• 1 exhaust air socket and fixing screws
• 1 panel for mounting the controller and fixing screws
Optional accessory KE 55 -70 L (figure 2):
• 4 small cordierite blocks
• 4 cordierite plates
• 1 chimney brick
• 1 exhaust tube
Status: 01 / 2016