Mitsubishi Electric CITY MULTI PEFY-P-NMHSU-E Manuel D'installation page 4

Masquer les pouces Voir aussi pour CITY MULTI PEFY-P-NMHSU-E:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

9
[Fig. 9.1.1]
~208/230V
L
, L
, G
1
2
[Fig. 9.2.1]
A
B
M1M2
M1M2
S
1
2
TB3
TB5
C
[Fig. 9.2.3]
B
D
1
S
E
M2
M1
G
L
2
L
1
[Fig. 9.3.1]
B
[Fig. 9.3.3]
F
G
L
L
G
M1
1
2
A
B
L
1
I
L
D
2
C
G
[Fig. 9.6.1]
4
A
B
C
PE
[Fig. 9.2.2]
A
M1M2
S
1
2
TB15 TB5
TB15
TB3
C
[Fig. 9.2.4]
2
A
DC10~13V
C
A B
1 2
A
A Screw holding cover (2 pcs)
B Cover
A Use conduit to keep the weight of the cable and external force from being applied to the power supply terminal
connector. Use a cable tie to secure the cable.
Wind the wire around the cable strap once to keep it from being pulled out.
M2
S
B Conduit
D Tensile force
F Power source terminal bed
H Terminal bed for remote controller
H
E
J Transmission line to the M-NET Remote controller
K
J
SW14
SWA
SW5
9.1
A Ground-fault interrupter
B Local switch/Wiring breaker
C Indoor unit
9.2
A
A
B
M1M2
M1M2
S
M1M2
TB5
TB5
C
B
2
D
1
S
M2
A
M1
G
L
2
E
L
1
9.3
[Fig. 9.3.2]
B
9.6
SW11
SWC
SW12
<Indoor controller board>
S
A Terminal block for indoor transmission cable
B Terminal block for outdoor transmission cable
C Remote controller
C
A Non-polarized
B TB15
C Remote Controller
D TB5
E Clamp
DC10~13V
C
A B
1 2
A Control box
B Knockout hole
C Remove
A
C
C Power source wiring
E Use ordinary bushing
G Terminal bed for indoor transmission
I To 1-phase power source
K Transmission line to the MA Remote controller

Publicité

Chapitres

Table des Matières
loading

Table des Matières