IMPORTANT
Because of the combined weight of the spa, water, and users, it is extremely important that the base where the
spa is installed is smooth, flat, level and capable of uniformly supporting this weight for the entire time the spa is
installed. If the spa is placed on a surface, which does not meet these requirements, any damage caused by
improper support will void the warranty. It is the responsibility of the spa owner to assure the integrity of the site at
all times.
INDOORS INSTALLATION: BE AWARE OF SPECIAL REQUIREMENTS IF YOU INSTALL THE SPA
INDOORS.
1. The floor must be able to withstand the capacity of the spa. The floor should be a non-slip, level surface.
2. Proper drainage is essential for indoor spa installation. When building a new room for the spa it is
recommended that a floor drain be installed.
3. Humidity is a natural side effect of spa installation. Determine the effects of airborne moisture on exposed
wood, paper, etc. in the proposed location. To minimize these effects it is best to provide plenty of ventilation
to the selected area. An architect can help determine if more ventilation is needed.
NOTE:
Do not install the spa on carpet or other material that can be damaged by moisture.
OUTDOORS INSTALLATION
1. No matter where you install the spa, it is important you have a solid support foundation. If you are installing the
spa outdoors, ensure there are no sharp objects that could damage it and that the location is level so the spa
sits stably and properly.
2. During filling, emptying or when in use, water may spill out of the spa. The spa should be installed near a
ground drain.
3. Do not leave the spa's surface exposed to direct sunlight for long periods of time.
C ASSEMBLY
1. Unfold the spa from the packaging. Spread the spa and cover. Make sure both are right side up.
2. Open the air outlet on the spa. Screw one end of the inflation hose onto it.
3. Open the air valve on the spa. Connect the other end of inflation hose into the valve.
4. Inflate the spa tub by pressing the "bubble" button.
1
3
4
- 17 -
XB 9165
2