Télécharger Imprimer la page

Brother PRHSL200 Manuel D'installation page 5

Cadre à broder pour manche

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 9
— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —
3
Move the left arm to align the screw on the
right side with the mark for the embroidery
frame to be installed, and then tighten the
thumb screws.
1 Mark for sleeve frame
● Please firmly tighten the two thumb screws
with the disc-shaped screwdriver included
in the embroidery machine accessory
package. The machine will recognize the
wrong frame size, if the two screws are not
tightened.
4
Hold the embroidery frame level, and then
simultaneously align both the left and right
mounts with the embroidery frame holder
clips.
• The inner frame should be on top.
Note
5
Insert the embroidery frame until it snaps
into place.
1 Make sure that the pins on the left and right arms
of the embroidery frame holder fit into the
positioning slot and hole on the embroidery
frame.
3/3

Publicité

loading