Connection Diagram; Closing The Device; Taking Into Operation; Maintenance/Servicing - CEAG GHG 524 44 Mode D'emploi

Fiches et prises de 63a, à 4 pôles et 5 pôles, pour utilisation industrielle
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 9
Item 1
Contact arrangement with switch
2-pole + PE
3-pole + PE
3-pole + N + PE
Standard
Code for voltage and No. of poles
acc. to IEC
Voltage
2-pole + PE
110 - 130V 50/60Hz
200 - 250V 50/60Hz
3-pole + PE
200 - 250V 50/60Hz
480 - 500V 50/60Hz
380 - 415V 50/60Hz
600 - 690V 50/60Hz
3-pole + N + PE
480 - 500V 50/60Hz
380 - 415V 50/60Hz
600 - 690V 50/60Hz
10
10
10
10
10
Cooper Crouse-Hinds GmbH
Plug and socket system 63A, GHG 524
Attention: Metal flanges, metal plates and
metal cable glands shall be included in the
Item 3 Item 4
equipotential earth connection.
6.3.2
Plug and coupler
Fig. 9:
In general, only the sealing inserts fitted in the
plug and coupler may be used. When
mounting the cable, attention has to be paid
that sealing inserts matching the cable
Item 2
diameter be used. After having connected the
cable, the coupling ring item 2 is to be
screwed fingertight until the sealing effect is
obtained. Then the screws item 4 of the pull-
relief, item 3, are to be tightened down.
Mind! Overtightening might impair the pull-
relief effect!
6.4

Closing the device

In order to ensure the required minimum
protection category, the cover screws, the
screws of the plug and of the coupler shall be
tightened down.
Overtightening might impair the protection
category.
Optional
Any foreign matter shall be removed from
the device.
6.5

Taking into operation

Prior to taking the apparatus into operation,
the tests specified in the relevant national
regulations shall be carried out. Apart from
that, the correct functioning and installation of
the apparatus in accordance with these
operating instructions and other applicable
regulations will have to be checked.
Check the plug for any damages before
putting it in the socket.
Clock
face
The user must ensure that a uniform
Colour (PE)
equipotential earth applies throughout when
the plug and socket system is operated.
yellow
4 h
blue
6 h
The inappropriate installation and
operation of the plugs and sockets can
blue
9 h
entail the loss of warranty.
black
7 h
red
6 h
black
5 h
black
7 h
red
6 h
black
5 h
7

Maintenance/Servicing

Before opening the enclosure, make sure
that the device is disconnected from the
voltage, or take appropriate protective
measures.
The required maintenance intervals depend on
the specific application and will therefore have
to be determined by the user dependent on
the conditions of use.
If during servicing, repairs prove to be
necessary, section 8 of these operating
instructions will have to be observed.
8
Repair/Overhaul/
Modifications
Repairs and overhaul may only be carried out
with genuine CEAG spare parts.
Modifications to the device or changes of
its design are not permitted.
9

Disposal/Recycling

When the apparatus is disposed of, the
respective national regulations on waste
disposal will have to be observed. In order to
facilitate the recycling of individual
components, plastic parts are provided with
the identification mark of the plastic material
used.
Subject to modifications or supplement of the
product range

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ghg 524 74

Table des Matières