General notes
GB
Correct position of the vial (Ø 24 mm):
Correct filling of the vial:
Replacement of batteries:
(F) instrument back
CAUTION:
To ensure that the instrument is water proof:
seal ring (E) must be in position
•
•
battery compartment cover (B) must be fixed with the four screws
If the batteries are removed for more than one minute the date and time menu starts auto-
matically when the photometer is switched on the next time.
MD200_9b 03/2020
(D) batteries
(C) notch for
(B) battery compart-
ment cover
(E) seal ring
(A) screw
IR data transfer
23