Installation Of The Motion Detector; Selection Of The Installation Location - FEIG Electronic MWD BP-C Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5

Installation of the motion detector

WARNING
The system must be disconnected from the power supply during the installation.
ATTENTION
The motion detector must be inspected for possible transport or other damage before
installation. Under certain circumstances, internal damage to the motion detector can result in
sever consequential damage to the motion detector up to a danger to health for the user.
Electrostatic discharging can result in damage or destruction.

5.1 Selection of the installation location

The device is mounted in the centre above the area to be monitored. In doing so, wall and ceiling mounting
are possible. The maximum installation height is approx. 7 m.
IMPORTANT
The device must be mounted so that it is vibration free.
There must be no moving objects in the radiation field in order to avoid spurious detection.
There must not be any fluorescent tubes within the radiation field of the detector.
The radiation fields of two motion detectors must not overlap as this can result in spurious
detections.
Do not install behind objects, building elements or covers.
If the motion detector is exposed to rain or snow, it should be set to directional recognition as
precipitation usually falls away from the device and thus does not trigger spurious detection.
If conductive floors are used and the radiation direction is almost vertical, spurious detection can
occur due to reflections.
FEIG ELECTRONIC GmbH
Manual
Page 31 of 103
MWD BP_Handbuch_mehrsprachig_12.doc
MWD BP

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mwd bp-dMwd bp-u

Table des Matières