INSTALLATION
INSTALLATION PROCEDURE
1. Prepare the cabling (see "Installation specifications"
earlier on in this guide).
2. Attach the wall bracket at the desired height
(+/- 1 metre) on the wall.
3. Twist the socket lid or dummy socket counter-clock-
wise and out of the cover of the charge point. Then
firmly pull the cover from the rear edge to open the
charge point. Do not use any objects to do this.
4. Put the charge point on the wall bracket to check its
placement. On the wall, mark the positioning of the
bottom two attachment points on the charge point
and select the appropriate fixtures (plugs, screws and
washers).
5. Secure the charge point to the wall bracket using
the two M8 x 12 mm bolts and washers provided.
Then secure the charge point to the wall using the
bottom two attachment points. Ensure that the grey
spacers are placed on the back of the charge point
at the bottom two attachment points.
6. Select the appropriate grommet to suit the cable
width and place it on the opening of the power cable
inlet. Moisten if necessary to make it easier to feed
the power cable through.
7. Connect the power cable and secure using the cable
clamp. Attach the ground wire to the yellow-green
terminal block, the neutral wire to the blue terminal
block and the phase wire to the grey terminal block.
8. Attach the black grommet to the opening next to the
power cable inlet to make the charge point watertight.
This step is not required for an attached charger
cable.
9. Note when using an attached charge cable: Select the
appropriate grommet to suit the cable width and place
it on the opening of the power cable inlet. Connect the
power to the attached charge cable on the designated
clips on the left of the charge point and secure the cable
well with the cable clamp. Connect the tethered cable
communication wires to the "connector for communica-
tion with the car" where indicated.
NB: To enable charging, the user must activate the charge point online. Activation is easy via my.newmotion.com
using the serial number of the charge point.
INSTALLATION INSTRUCTION – ENGLISH – P10
10. Note when using Ethernet connection: Feed the UTP
cable through the rubber stop on the data cable inlet
and then connect it to the Ethernet port.
Call NewMotion to activate the ethernet-connection:
NL: +31 (0)88 010 9500 UK: +44 (0)203 868 1036.
11. Note when using a pole: Earth the pole with the earth
wire via the lower right bolt attachment on the charge
point (see earthing diagram).
12. Connect the power cable to the mains.
13. Switch on power to the charge point
(charge point starts up).
14. Check that the charge point is connected to the
network. A quick check can be done via
chargeportal.newmotion.com/test. Simply enter the
serial number into the search field and click "Search".
"Online" should appear after the serial number.
If 'Online' does not appear, check whether the
charge point is properly connected and try again.
For persistent issues, please contact NewMotion on:
NL: +31 (0)88 010 9500 UK: +44 (0)203 868 1036.
15. Secure the cover on the charge point. Tighten the four
M4 x 12 mm bolts provided around the socket so that
the cover closes on the rubber seal but the rubber
seal does not deform. Tighten the other two M4 x 12
mm bolts provided on the bottom of the cover.
16. Twist the socket lid or dummy socket clockwise in
the cover and lock using the M4 x20 mm bolt
provided. The bolt must be secure, but not too tight.
17. Attach the appropriate stickers provided
(1-phase or 3-phase) to the sides of the charge point
in the designated indented spaces.
18. Indicate which circuit(s) the charge point is connected
to in the distribution board.