Minebea Intec YDO02C-232 Notice D'installation page 16

Port de sortie pour interface combics | signum unicom
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

DeviceNet-Installation YDO02C-DN (B3)
1*) DeviceNet ­
Board
(UniCom)
Combics 1
DeviceNet ­ Installation:
DeviceNet - Installation:
Open the housing.
Mount the DeviceNet Board (*1) to the
- Open the housing
Mainboard (*3) with distance bolts and screws.
- Mount the DeviceNet Board (* 1) to the motherboard (* 3)
Mount the cable gland.
with bolts and screws
Prepare the DeviceNet – Cable(2*).
- Assemble the cable gland
Connect the DeviceNet – Cable at the terminal.
- Prepare the DeviceNet - Cable (2 *)
- Pull the cable through the ferrite core
Fasten the cable with the cable gland.
- Connect the DeviceNet - Cable at the terminal
Remove the screw near the strain gauge
- Fasten the cable to the cable gland
terminal and fasten the metal sheet, which
- The cable shield is not connected to the case
covers the red capacitors, with the same screw.
- Remove the screw near the strain gauge terminal and fasten the
Additionally a conductive fastening to the Board
metal sheet, which covers the red capacitors, with the same screw
Level Shield is realized with a piece of
- Additionally a conductive fastening to the Board Level Shield is
self­adhesive aluminum tape.
realized with a piece of self-adhesive aluminum tape
1) Combics 1
YDO02C
16
2*) DeviceNet
3*) Mainboard
Cable
Combics 2/3
1)
5*) Analog to Digital Converter
4*) ADC ­
Capacitors
1)
(ADC)
with Board Level Shield

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ydo0.sw-232Ydo0.sw-232 option a1Ydo02c-485Ydo0.sw-485/422Ydo0.sw-485/422 option a3Ydo0.sw-485/422 a2 ... Afficher tout

Table des Matières