3.1 OPERATING INSTRUCTIONS
Place the frame in a vertical position with its lower end resting
between the two rollers; insert the comb holder between the two
white polyethylene guides until it is firmly held by the central
support guide.
Press the upper lever down to drive the frame between and
through the rollers.
Costruzioni Apistiche – via Maestri del Lavoro 23 – 48018 Faenza
www.legaitaly.com - Tel 054626834 – Fax 054628279 – P.iva 00043230390
9 / 21