Télécharger Imprimer la page

Dyson AB 06 Guide D'installation page 4

Publicité

Les langues disponibles

Les langues disponibles

In this box.
Main unit x 1
Wall bracket x 1
Service tool x1
Hardware
To install the Dyson Airblade™ hand dryer
you will need (6) screws, toggle or masonry
bolts and appropriate hardware for the wall
type and weight of the unit (recommended
minimum size of 7mm).
1
Remove fascia.
WARNING
Use caution when removing the fascia. The fascia
may have sharp edges/corners which may cut or
cause harm.
1. Remove the (4) tamper-proof screws from the
unit with the service tool provided. Store safely.
2. NoTe: Some models have a small door at the
base of the machine. Remove the (1) tamper-
proof screw with the service tool.
3. Remove the fascia as shown.
2
Selecting the height.
electrical
wiring entry
point (use
235mm
one only).
990mm adult male height.
915mm adult female height.
815mm child/wheelchair user height.
Height measurements are from the floor.
1. Select a location that will allow accessibility to
the Dyson Airblade™ hand dryer and proper
clearance from surroundings and floor. Allow
at least 200mm clearance under the unit.
2. Recommended heights are shown, but may
need to be adjusted for each individual
installation.
Electrical wiring entry:
The rear electrical wiring entry point is via one of
the knock-out holes on the backplate.
Pry the appropriate knock-out from the
backplate. Knock out only one hole.
4
The electrical wiring route can be either:
1. From the wall: directly into the electrical wiring
entry point.
2. From the base: via the exterior electrical wiring
channel in the backplate and into the electrical
wiring entry point. ensure the electrical wiring
is not trapped between the backplate and the
wall.

Publicité

loading