CHIEF KITE Série Instructions D'installation page 7

Masquer les pouces Voir aussi pour KITE Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions
2.
Orient projector with interface bracket. (See Figure 4)
3.
Lift projector so that screws with thumb nuts are aligned
with mounting slots in mount base. (See Figure 4)
4.
Slide projector with mounting bracket onto mounting slots in
mount base until screws are seated against the back of
mounting slots. (See Figure 4)
Example Only
(Interface bracket
varies dependent
on projector model)
Figure 4
WARNING:
IMPROPER INSTALLATION CAN LEAD TO
PROJECTOR FALLING RESULTING IN SERIOUS
PERSONAL INJURY OR DAMAGE TO EQUIPMENT. Make
certain mounting slots in mount base slide under thumb
screws and that screws are seated in the back of slots.
5.
Verify mounting screws are properly seated in mounting
slots in mount base.
6.
Move locking lever to "Locked" position. (See Figure 5)
7.
Insert key into lock and turn to secure projector to mount.
(E)
4
3
Example Only
(Interface bracket
varies dependent on
projector model)
6
ADJUSTMENTS
YAW Adjustment
1.
Loosen YAW adjustment locking screw using a #2 Phillips
screwdriver. (See Figure 6)
2.
Turn YAW micro-adjustment screw right or left using a #2
Phillips screwdriver until image is properly aligned on target.
(See Figure 6)
3.
Tighten YAW adjustment locking screw using a #2 Phillips
screwdriver. (See Figure 6)
Example Only
(Interface bracket
varies dependent
on projector model)
2
KITE SERIES
Figure 5
1
Figure 6
3
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Kitec080135/bKite030045Kite080150w

Table des Matières