Supplies Required - Bradley S19-310AC Manuel D'installation

Masquer les pouces Voir aussi pour S19-310AC:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
Installation

Supplies Required:

• (3) 3/8" floor anchors and bolts
• Teflon tape and pipe sealant
• Piping to 1-1/4" NPT water supply inlet and 1-1/4"
NPT drain outlet on unit
• Adequate supply pipe supports
• Minimum 4" (102mm) drain to accommodate 30
gallons (115 liters) per minute discharge for shower
waste
• OPTIONAL: sign-mounting hardware
NOTE: Local codes may require the installation
of a backfl ow prevention valve to complete proper
installation. Compliance with local codes is the
responsibility of the installer. Valve must be tested
annually to verify that it is functioning properly. Backfl ow
prevention valves are not included with the fi xture and
may be supplied by the contractor or purchased from
Bradley Corporation.
Step 1: Secure base to floor
1. Install three suitable anchors (supplied by installer)
for 3/8" bolts in the floor.
2. Bolt the base to the floor anchors using 3/8" bolts
(supplied by installer).
Step 2: Assemble components
1. Assemble the remaining unit components as
shown on page 4.
• Apply pipe sealant (by installer) to all male-
threaded pipe joints.
• Use the rubber grip pad provided or a strap
wrench around pipes when tightening to prevent
marring. Place the grip pad on the pipe, then
put the wrench over the grip pad and turn the
pipe with the wrench.
• When connecting the steel chain, first connect
the chain to the "S" hook on the foot treadle.
Then, with the foot treadle raised up, straighten
the chain and connect a link to the "S" hook on
the valve handle. Make sure the chain is pulled
tight. The length of chain will vary.
• Bottom edge of the showerhead should be 7'-2"
(2180mm) from floor.
Step 3: Connect water supply
IMPORTANT: Do not rely on Bradley's
Combination Unit to support supply piping.
1. Connect water supply piping to 1-1/4" NPT inlet
on unit (piping by installer). Provide adequate
supports (by installer) for supply pipe using pipe
hangers or other means.
2. Connect drain piping to 1-1/4" NPT drain outlet on
unit (piping by installer).
3. Hang the safety sign from the unit with the curtain
hooks provided (or mount it to the wall using sign-
mounting hardware by installer).
Bradley Corporation • 215-163AC Rev. Z; ECN 08-512
25-3/8"
(645mm)
4-1/2"
(114mm)
3.1"
(78.7mm)
9"
7'-2"
(229mm)
(2180mm)
to
Floor
Ø 10-3/4"
(273mm)
10-1/2"
(267mm)
Top View From Bowl
NOTE: All dimensions assume standard thread
engagement. Variations in manufacturing allow for
+/- 1/8" (3mm) per threaded joint. To fi nd the tolerance
of a dimension, add the number of thread joints in
between a dimension and multiply it by 1/8" (3mm).
9/11/08
S19-310AC
24"
(610 mm)
(1676mm)
6-1/2"
(165mm)
36-3/8"
(924mm)
6"
(152mm)
9-1/2"
(241mm)
Ø 9" (229mm)
Flange with (3) Ø
3/8" (10mm) Holes
on Ø 8" (203mm)
Bolt Circle
66"
to
Floor
3

Publicité

Table des Matières
loading

Table des Matières