3.2 Quick Start
Remove the protection strip from the
robot's Bumper before use.
Charging Dock Placement
1
Place the Charging Dock on a level
floor surface against the wall with the
base perpendicular to the ground. Keep
the immediate area 1.5m (5') in front
of the charger and 0.5m (1.6') on both
sides of the charger clear of objects and
reflective surfaces.
Plug the Charging Dock in.
* Do not change the location of the
Charging Dock once DEEBOT has
scanned the environment. If it is
necessary to relocate Charging Dock,
power OFF DEEBOT and then power
back ON so DEEBOT can re-scan the
environment.
2
Install Side Brushes
Attach Side Brushes to the bottom of
DEEBOT by pressing a brush into each
slot with the matching color until it clicks.
3. Operating and Programming
9
EN