DUCTWORK, WIRING LOCATIONS
• Determine the exact location of the vent hood.
• Locate the template packed with the literature.
• Measure 36" from the floor to the top of the cooking
surface. Add hood installation height determined on
page 8. Mark that location.
• Tape the template in position along the penciled line.
CHECK TO BE SURE THE TEMPLATE IS LEVEL.
• Use a level to draw a line straight up, from
the centerline on the template to the ceiling.
• Drill 1/8" Pilot Holes For Mounting Brackets.
• Drill 1/8" Pilot Holes.
Align edge 25-1/2" above Cooking Surface.
HOUSE WIRING LOCATION:
• The junction box is located on the top left side
of the hood.
• Wiring can enter from the back wall or ceiling above
the top bracket location. Route additional wiring
length to reach the junction box.
Installation Instructions
INSTALLATION – RECIRCULATING
5-7/8"
17-5/16"
C L
• Drill 1/8" Pilot Holes.
1
INSTALL FRAMING FOR
HOOD SUPPORT
IMPORTANT:
to rear support framing or a wall stud. Framing
must be capable of supporting 100 lbs.
If drywall is present, mark the screw hole locations
for the top mounting brackets. Remove the template.
• Cut away enough drywall to expose 2 vertical studs
at the bracket location indicated on the template.
• Install a horizontal support at least 1" x 12"
between two wall studs at the mounting screw
location. The horizontal support must be flush with
the room side of the studs. Use cleats behind both
sides of the support to secure to wall studs.
IMPORTANT: Reinstall drywall for an even mounting
surface.
14
The vent hood must be secured
View from
rear cleats
1" x 12" min.
mounting
support
Centerline of
installation
space
NOTE: 2 horizontal supports
will be needed if there is a
stud located between the
horizontal screw locations.