Télécharger Imprimer la page

Thetford Sanicon TURBO 300 Mode D'emploi page 4

Masquer les pouces Voir aussi pour Sanicon TURBO 300:

Publicité

Installation, cont'd.
Connect Electrical
2A
K4
Ref.
Description
K1
Macerator Pump
K3
Macerator Switch
K4
35A Fuse/Breaker
2A
Battery
2B
Relay
2C
Thermal Cut-off Switch Over-Temperature Switch (90°C) nor-
mally closed
2D
Ground
Fig. 2 shows recommended wiring confi guration. Other wiring
confi gurations are possible based on your installation.
Pump requires a 12-VDC/35 AMP dedicated circuit with 35
AMP breaker or fuse between main bus or battery.
Wire size is dependent on distance between pump and
power source. Actual wire sizes should be calculated ac-
cording to installation.
Wire Gauge Size Chart
If Wire Gauge for distance from
source* is:
12 VOLTS - Install
* Distance measured assumes power
and ground wires.
Wire Size
■ Wire size is dependent on the distance between the pump and power source. Actual wire sizes should be calculated according
to installation.
■ Excess wire can be cut to length.
97571 Rev. C (07/10/2017)
Fig. 2
Pump Assembly
2B
85
86
0-18 feet
19-32 Feet
(Included)
10 Gauge
8 Gauge
Fig. 3
4
K3
K1
While the pump is turned on, make sure electrical
AVISO
AVIS
!
NOTICE
CAUTION
system by measuring voltage at motor; (must be
12V). Improper installation may cause damage to
motor or decrease pump effi ciency.
he positive and negative wires to prevent radio
Braid t
NOTICE
interference during operation.
33-50 feet
6 Gauge
2C
18G BLU
18G BLU
Included in product
Circuit Breaker
35 amp
®
Turbo - Model 300
SANICON
2D
2D

Publicité

Chapitres

loading