Installing Bc Controller; Installing Bc Controllers - Mitsubishi Electric City Multi CMB-P104NU-J1 Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4. Installing BC controller

4.1. Installing BC controllers

Installing hanging bolts
To hang the unit, use a lifting machine to lift and pass it through the hanging bolts.
Suspension bracket has an oval hole. Use a large diameter washer.
[Fig. 4.1.1]
CMB-P104, 106, 108NU-J1,
CMB-P104, 108NU-KB1
A Nut (not supplied)
B Double nut (not supplied)
C Hanging bolt ø10 (M10 screw) (not supplied)
D Washer (with cushion) (supplied)
* Attach the cushion facing down.
E Minimum 30 mm [1-3/16]
F Washer (without cushion) (supplied)
[Fig. 4.1.2]
<Ⓒ>
A Within 1.5º
B Drain socket
C Viewed from the front of the control box
D Viewed from the drain socket side
Be sure to install the BC controllers level. Installing obliquely may cause a risk of drain leakage. Use a level to check the unit's level. If it is oblique,
Provide a downward pitch of 1.5º or below to the BC controller.
Install the BC controllers with the hanging length within 200 mm [7-7/8 in] or shorter.
within 200 mm
BC controller
Caution:
Be sure to install the unit body level.
CMB-P1012, 1016NU-J1
CMB-P108, 1012, 1016NU-JA1
CMB-P1016NU-KA1
14 [9/16]
(Top view)
30
[1-3/16]
Ceiling void
Ceiling
(Unit: mm [in])
<Ⓓ>
9

Publicité

Table des Matières
loading

Table des Matières