Anleitung_BG_DW_1300_N_SPK1:_
4. Technical data
Power supply
Power rating
Delivery rate max..
Delivery height max
Immersion depth max.
Water temperature max.
Hose connection
Max. particle size
Power cable
Pump cable
5. Before putting the equipment into
operation
5.1 Installation
The equipment can be installed either:
Stationary with rigid tubing
or
Stationary with a flexible hose line
Connect the pressure hose or pipe to the
pressure
connector (3) using a suitable connector.
Fasten the securing cable (10) to the suspension
eyelet (Figure 3/Item A).
5.2 Mains connection
The equipment you have purchased comes with an
earthing-pin plug. The equipment is designed for
connection to a socket outlet with earthing contact for
230 V ~ 50 Hz. Make sure that the socket-outlet is
sufficiently fused (at least 6 A) and in good working
order. Insert the power plug in the socket-outlet and
the equipment is ready for operation.
Important!
To rule out danger, this work must be left strictly to a
specialist electrician or Customer Service.
6. Operation
You can put the equipment into operation after you
have thoroughly read the installation and operating
instructions. Pay attention to the following points:
Please note
The switchbox (Figure 2/Item 5) may only be
installed outside the well.
25.08.2009
10:19 Uhr
1. Lower the pump into the well or shaft using the
securing cable.
2. Ensure that the pump is completely submersed
230V ~ 50Hz
in the
water.
1300 Watt
3. Connect the mains plug on the switchbox to the
5.000 l/h
socket.
65 m
4. The mains indicator (Figure 2/Item 7) will be lit.
5. Press the On/Off switch (Figure 2/Item 8) to start
20 m
the
35°C
lit.
1 1/2" threaded end
Please note
clear water
If the pump suffers an overload the overload switch
2 m
(Figure 2/Item 9) will trip.
22 m
Push the switch in again after you have allowed the
unit to cool.
7. Replacing the power cable
The power cable of this equipment cannot be
replaced. If the power cable is damaged, the
equipment must be scrapped.
8. Cleaning, maintenance and
ordering of spare parts
Important!
Unplug the power plug prior to any maintenance
work.
For mobile applications, the equipment should be
cleaned with clear water after every usage.
Undo the fastening screws on the dirt screen
(Figure 1/Item 4) and clean the dirt screen and
intake section.
Insert the dirt screen again.
8.1 Maintenance
There are no parts inside the equipment which
require additional maintenance.
8.2 Ordering replacement parts:
Please quote the following data when ordering
replacement parts:
Type of machine
Article number of the machine
Identification number of the machine
Replacement part number of the part required
For our latest prices and information please go to
www.isc-gmbh.info
Seite 9
pump. The operating indicator (6) will be
GB
9