Control Box - Mitsubishi Electric City Multi PUHY-P-YJM-A Série Manuel D'installation

Table des Matières

Publicité

11
[Fig. 11.2.1]
A
Power supply terminal block
(TB1)

Control box

L1 L2 L3 N
[Fig. 11.2.2]
A : Cable strap
A
B : Power source line
C : Transmission line
D : Pillar
D
A
B
B
[Fig. 11.3.1]
<A> Change the jumper connector
from CN41 to CN40 *1
<B> SW2-1:ON *2
( ) Address
<C> Keep the jumper connector
on CN41
<B> SW2-1:ON *2
*1: When the power supply unit is not connected to the transmission line for centralized control, disconnect the male power supply
connector (CN41) from ONE outdoor unit in the system and connect it to CN40.
*2: If a system controller is used, set SW2-1 on all of the outdoor units to ON.
B
Terminal block for indoor –
outdoor transmission line
(TB3)
C
C
A
OC
IC
CN40
(51)
(01)
TB3
TB5
M1 M2
M1 M2 S
M1M2 S
TB7
D
A B
(101)
RC
L
3
OC
IC
CN40
(52)
(02)
TB3
TB5
M1M2
M1 M2 S
M1M2 S
TB7
System
controller
A B S
11.2
A : Power source
Terminal block for
B : Transmission line
centralized control
C : Earth screw
(TB7)
11.3
L
1
B
IC
IC
(04)
(05)
TB5
TB5
M1 M2 S
M1 M2 S
3
A B
(105)
(155)
RC
E
L
4
IC
IC
(03)
(07)
TB5
TB5
M1 M2 S
M1 M2 S
A B
(103)
RC
C
IC
(06)
TB5
M1 M2 S
A B
RC
9

Hide quick links:

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

City multi puhy-ep-yjm-a sérieCity multi puhy-p-yjm-a-bs sérieCity multi puhy-ep-yjm-a-bs sérieCity multi puhy-p200yjm-a-bsCity multi puhy-p250yjm-a-bsCity multi puhy-p300yjm-a-bs ... Afficher tout

Table des Matières