2. Installing the indoor unit

25/32 to 1-25/32
6-5/16
7-3/8
3-17/32 3-15/16 3-15/16 3-17/32
13-25/32
Ceiling
Use inserts rated at 100-150kg, 221-331 Ibs each
Rafter
(procure locally)
Beam
Suspension bolts M10 (3/8") (procure locally)
Roof beam
Steel reinforcing rod
37-3/8
25/32 to 1-25/32
32-27/32 to 35-13/16
31-7/8
6-5/16
33-1/16
Min. 19-11/16
Fig. 2-2
120°
Fig. 2-3
Unit
Grille
Pillar
Fig. 2-4
2.2. Ceiling openings and suspension bolt installation
(inch)
locations (Fig. 2-2)
Caution:
Install the indoor unit at least 2.4m (94-1/2 inch) above fl oor or grade level.
• Using the installation template (top of the package) and the gauge (supplied as
an accessory with the grille), make an opening in the ceiling so that the main unit
can be installed as shown in the diagram. (The method for using the template
and the gauge is shown.)
* Before using, check the dimensions of template and gauge, because they
change due to fl uctuations of temperature and humidity.
* The dimensions of ceiling opening can be regulated within the range shown
in Fig.2-2; so center the main unit against the opening of ceiling, ensuring
that the respective opposite sides on all sides of the clearance between them
becomes identical.
• Use M10 (3/8") suspension bolts.
* Suspension bolts are to be procured at the fi eld.
• Install securely, ensuring that there is no clearance between the ceiling panel &
grille, and between the main unit & grille.
Outer side of main unit
A
Bolt pitch
B
Ceiling opening
C
Outer side of Grille
D
* Note that the space between ceiling panel of the unit and ceiling slab and etc must be 10 to
15 mm, 25/64 to 19/32 inch.
* When the optional multi-functional casement is installed, add 135mm, 5-5/16 to the dimen-
sions marked on the fi gure.
Models
P12, P15, P18, P24, P30
P36
(inch)
2.3. Branch duct hole and fresh air intake hole
(Fig. 2-3)
At the time of installation, use the duct holes (cut out) located at the positions
shown in Fig.2-3, as and when required.
• A fresh air intake hole for the optional multi function casement can also be made.
Note:
The fi gure marked with * in the drawing represent the dimensions of the main
unit excluding those of the optional multi function casement.
* When installing the optional multi function casement, add 135 mm, 5-5/16
inch to the dimensions marked on the fi gure.
When installing the branch ducts, be sure to insulate adequately. Otherwise
condensation and dripping may occur.
When installing the fresh air intake hole, be sure to remove the insulator P
that is pasted on the indoor unit.
Branch duct hole
A
Indoor unit
B
Fresh air intake hole
C
Drain pipe
D
Refrigerant pipe
E
Branch duct hole diagram
F
(view from either side)
14-ø2.8 mm, ø1/8 inch burring hole
G
(inch)
2.4. Suspension structure (Give site of suspension
strong structure) (Fig. 2-4)
• The ceiling work differs according to the construction of the building. Building
constructors and interior decorators should be consulted for details.
(1) Extent of ceiling removal: The ceiling must be kept completely horizontal and
the ceiling foundation (framework: wooden slats and slat holders) must be rein-
forced in order to protect the ceiling from vibration.
(2) Cut and remove the ceiling foundation.
(3) Reinforce the ends of the ceiling foundation where it has been cut and add ceil-
ing foundation for securing the ends of the ceiling board.
(4) When installing the indoor unit on a slanted ceiling, attach a pillar between the
ceiling and the grille and set so that the unit is installed horizontally.
Wooden structures
1
• Use tie beams (single storied houses) or second fl oor beams (two story houses)
as reinforcing members.
• Wooden beams for suspending air conditioners must be sturdy and their sides
must be at least 6 cm, 2-3/8 inch long if the beams are separated by not more
than 90 cm, 35-7/16 inch and their sides must be at least 9 cm, 3-9/16 inch long
if the beams are separated by as much as 180 cm, 70-7/18 inch. The size of the
suspension bolts should be ø10 (3/8"). (The bolts do not come with the unit.)
Ferro-concrete structures
2
• Secure the suspension bolts using the method shown, or use steel or wooden
hangers, etc. to install the suspension bolts.
Grille
E
Ceiling
F
Multi function casement (option)
G
Entire periphery
H
(mm, inch)
C
D
241, 9-1/2
258, 10-3/16
281, 11-1/16
298, 11-3/4
ø150 mm, ø5-29/32 inch cut out hole
H
ø175 mm, ø6-7/8 burring hole pitch
I
Fresh air intake hole diagram
J
3-ø2.8 mm, ø1/8 inch burring hole
K
ø125 mm, ø4-29/32 inch burring hole pitch
L
ø100 mm, ø3-15/16 inch cut out hole
M
Ceiling
N
Detailed fi gure of removing the insulator
O
Insulator
p