Preparing your harness
Installation of the reserve parachute
4. Place the reserve, and the rest of the risers, in the
container. Position the reserve so that the connection with the
handle is down and as close as possible to the location of the
handle (see image).
5. Using a rod, close the mobile shutters as shown in the
diagram. (Step 1)
6. Insert the 2 needles from the handle through the 2 loops in
order to lock the mobile flaps. (Step 2) CAREFUL: only 1 needle
per loop!
7. Insert the 2 needles from the container, through the 2 holes
provided on the reserve handle. (Step 3)
8. Insert the 2 needles in the sheath located on the side of the
container. (Step 4)
At the end of assembly, it is imperative to check scrupulously that no
At the end of assembly, it is imperative to check scrupulously that no
assembly tools are left in place (rod, hanger). This would make it
assembly tools are left in place (rod, hanger). This would make it
impossible to extract the parachute if necessary.
impossible to extract the parachute if necessary.
More detailed information is available at www.korteldesign.com
More detailed information is available at
www.korteldesign.com
46
1
2
Step 1
5
Step 2
3
Step 3
KOLIBRI EVO
Reserve handle
1
Reserve parachute
2
Closing needles
3
Sheath
4
Mobile flaps
5 5
Step 4