Unlocked state
Locked state
1.3 Drainage hook installation
Place the concave buckle of the drainage hook downward, and then buckle it down on the bed
frame beam, as shown in the figure below:
1.4 IV pole installation
Female part installation: Press the plastic hook(female part) down on the Φ16mm stainless steel
pipe.
Male part installation: Place the plastic hook (male part) directly above the female part in a cross
shapes, and then aligns the buckles on the male part with the slots on the female part and press
down. After hearing a "click", check whether the end of the buckle is tight, if it is tight, then complete
the installation, if not, continue to press down until the buckle is tight.
- 4 -