3. Adjustment before use
Position the arms to suit the size of the panels and lock them by means of the "clips" pins on the
beam.
Position the panels so that the load is evenly distributed.
Minimum loading height : 0.81 m.
Maximum fixing height : 4.00 m.
4. Fixing under pitches
Unlock the head and incline it in order to be able to pivot the arms a quarter of a turn.
Undo the wing nuts which fix the stops so as to bring the latter from position A to position B and
retighten the wing nuts, which will make it possible to receive the plasterboard panel.
A2 A3
B. SAFETY RULES
Make sure that :
All the elements are perfectly assembled,
Nothing impairs the proper working of the EASY PRO LEVPANO®
Before lifting a load :
Make function the EASY PRO LEVPANO® and check the general state of the device
Make absolutely sure that the cables are correctly wound on the winch's drums, and check their
position in the groove of the corresponding pulleys.
Verify that the cables are parallel to the inside of the columns so as to enable the assembly to
work properly.
Lock the 2 wheels provided with a brake.
Make sure that the columns are clean.
Do not rotate the winch crank any longer, when the indicator situated at the bottom of the
intermediate column appears.
THE FOLLOWING IS FORBIDDEEN :
Do not use the EASY PRO LEVPANO® :
Beyond the maximum use load
If a cable is broken
Beyond the maximum fixing height
Do not remain under the load.
When using the EASY PRO LEVPANO® comply with the work hygiene and safety rules.
(75 kg)